Daewoo Matiz since 1997 of release
1. The general data
2. Maintenance service
3. The engine
3.1. A mechanical part of the engine
3.1.1. The design description
3.1.2. Possible malfunctions of the engine and methods of their elimination
3.1.3. Diagnostics
3.1.4. The air filter in gathering
3.1.5. A hose and the ventilation valve картера
3.1.6. An inlet collector
3.1.7. A final collector
3.1.8. A gear belt
3.1.9. The oil pallet
3.1.10. The oil pump
3.1.11. A head of the block of cylinders
3.1.12. An engine mount pillow
3.1.13. A forward pillow of an engine mount
3.1.14. Removal and engine installation
3.1.15. Repair of a head of the block of cylinders
3.1.16. The block of cylinders, a cranked shaft, pistons and rods
3.2. Cooling system
3.3. An electric equipment
3.4. A control system of the engine
3.5. System of release of the fulfilled gases
4. Transmission
5. A running gear
6. A steering
7. Brake system
8. Systems of heating, ventilation and air-conditioning
9. A body electric equipment
10. A body
11. Schemes электроборудования
 









3-1-7-vypusknojj-kollektor.html

3.1.7. A final collector

The prevention
Do not remove a final collector, when it hot.

Disconnect a wire of "weight" from the storage battery.
Remove the case of the air filter, the resonator and an air branch pipe in gathering.
Disconnect wires of a high voltage from spark plugs.
Disconnect a socket of the gauge of oxygen.
Turn away a nut, disconnect a reception exhaust pipe from a final collector and remove a lining.
Remove a thermoprotective casing of a final collector and a final collector in a following order:

Fig. 3.14. Sequence of a tightening of nuts () fastenings of an inlet collector and a nut arrangement (b) fastenings of a thermoprotective casing





- Turn out bolts b (fig. 3.14);
- Remove a thermoprotective casing of an inlet collector;
- Turn out nuts and bolts and;
- Remove a final collector;
- Remove a lining.
Check up a lining on absence of a break, cracks and damages.
Installation spend to sequences, return to removal, taking into account the following.
Establish seven nuts and bolts of fastening of a final collector and tighten them in the sequence shown on fig. by 3.14 moment 17—27 Нм.
Tighten bolts of fastening of a thermoprotective casing of a final collector the moment 8—12 Нм.
Tighten nuts of fastening of a reception exhaust pipe the moment 25—35 Нм.



To return back
3.1.6. An inlet collector
On the following page
3.1.8. A gear belt